Reliable artificial intelligence in the situational management of guided robotic platforms of industrial enterprises.
DOI:
https://doi.org/10.34121/1028-9763-2024-1-34–54Keywords:
guided robotic platform, situational control, reliable artificial intelligence, artificial neural network, forecasting, rechargeable battery, керована робототехнічна платформа, ситуаційне управління, надійний штучний інтелект, штучна нейронна мережа, прогнозування, акумуляторна батареяAbstract
The incorporation of guided robotic platforms (GRPs) has become an essential component of Industry 4.0. A significant amount of data obtained from sensors can be used for intelligent control. Analyzing and selecting informative data, as well as removing redundant data for subsequent use, is a crucial task. The paper analyses and compares different industrial enterprise management types that utilize GRPs. A comparative analysis of procedures for optimizing the decision choice in general and situational management has been carried out. It has been proved that using traditional management for industrial enterprises that use GRPs is ineffective. The advantages and disadvantages of traditional and situational management of industrial enterprises are shown. Taking into account the shortcomings of each of them, the authors have developed an improved method of situational management that utilizes reliable artificial intelligence (AI). For this purpose, the stages of the modified general procedure for optimizing the choice of AI solutions have been described. A mathematical description of the process of evaluating alternatives has been made, which can be adapted to the use of AI models and their training. A model of the procedure for optimizing the choice of solutions based on situational control that considers the GRP’s battery charge has been developed. The model has been tested on a route map built at an industrial enterprise for the GRP Formica 1 manufactured by AIUT, Gliwice, Poland. The frame of the GRP Formica 1 data acquisition structure has been described. Data mining has been applied to the collected sensor data. The predictive model has been built based on an artificial neural network with deep learning and takes into account the residual charge of the battery, the mass transported by the GRP, and the presence of obstacles on its way. The mean absolute percentage error for the short-term forecast of the battery discharge of the GRP has decreased to 8 %. This proves the high efficiency of the developed method of situational control.References
1. Zhan C., Jianning G., Yuanyuan L. Research on AGVS Dynamic Path Planning Method Based on UGNL. Proc. of the 2020 2nd International Conference on Robotics, Intelligent Control and Artificial Intelligence. New York, 2020. P. 1–6. DOI: 10.1145/3438872.3438873.
2. Martin X.A., Hatami S., Calvet L., Peyman M., Jugan A. Dynamic Reactive Assignment of Tasks in Real-Time Automated Guided Vehicle Environments with Potential Interruptions. Applied Sciences. 2023. Vol. 13 (6). Р. 3708. DOI: 10.3390/app13063708.
3. Lee M.S., Jang Y.J. The AGV Battery Swapping Policy Based on Reinforcement Learning. 2022 IEEE 18th International Conference on Automation Science and Engineering (CASE). China, 2022. P. 1479–1484. DOI: 10.1109/CASE49997.2022.9926504.
4. Research of AGV Route Planning Algorithms. 3rd International Academic Exchange Conference on Science and Technology Innovation (IAECST). Guangzhou, 2021. Р. 312–316. DOI: 10.1109/IAECST54258.2021.9696355.
5. Ramos-Soto A., Dacal N., Alcrudo M., Mosquera G., Areal J. Analysis of Automated Guided Vehicles Performance Based on Process Mining Techniques. Journal Data Technologies and Applications. 2023. DOI: 10.1108/DTA-02-2023-0054.
6. Rey R., Corzetto M., Cobano J., Merino L., Caballero F. Human-Robot Co-working System for Warehouse Automation. 2019 24th IEEE International Conference on Emerging Technologies and Factory Automation (ETFA). Spain, 2019. Р. 578–585. DOI: 10.1109/ETFA.2019.8869178.
7. Sikora L., Tkachuk R., Lysa N., Dronyuk I., Fedevych O. Information and Logic Cognitive Technologies of Decision-making in Risk Conditions. IntelITSIS. Khmelnytskyi, 2020. Р. 340–356.
8. Grznar P., Gregor M., Gaso M., Gabajova G., Schickerrle M., Burganova N. Dynamic Simulation Tool for Planning and Optimization of Supply Process. International Journal of Simulation Modelling. 2021. Vol. 20 (3). P. 441–452. DOI: 10.2507/IJSIMM20-3-552.
9. Tamási T., Kis T. Decentralized and Prioritized Algorithm for AGV Fleet Management. IFACPapersOnLine. 2021. Vol. 54 (1). P. 98–103. DOI: 10.1016/j.ifacol.2021.08.155.
10. Guo Y., Zhang W., Qin Q., Chen K., Wei Y. Intelligent Manufacturing Management System Based on Data Mining in Artificial Intelligence Energy-Saving Resources. Soft Computing. 2023. Vol. 27 (7). P. 4061–4076. DOI: 10.1007/s00500-021-06593-5.
11. Wang Z., Sheng C., Zhiyong W., Lei Z. Design of AGV Human-Machine Interactive Control System. Journal of Physics. Conference Series. 2020. Vol. 1678 (1). Р. 012009. DOI: 10.1088/1742-6596/1678/1/012009.
12. Гречанінов В.Ф. Теорія ситуаційного управління та практика реалізації на прикладі базового моделюючого комплексу сектора безпеки і оборони. Математичні машини і системи. 2021. № 4. С. 15–34.
13. Pavliuk O., Steclik T., Biernacki P. The forecast of the AGV battery discharging via the machine learning methods. 2022 IEEE International Conference on Big Data (Big Data). Osaka, Japan, 2022. Р. 6315–6324. DOI: 10.1109/BigData55660.2022.10020968.
14. Pavliuk O., Cupek R., Steclik T., Medykovskyy M., Drewniak M. A Novel Methodology Based on a Deep Neural Network and Data Mining for Predicting the Segmental Voltage Drop in Automated Guided Vehicle Battery Cells. Electronics. 2023. Vol. 12, N 22. P. 4636. DOI: https://doi.org/10.3390/electronics12224636.
Published
Issue
Section
License
Copyright (c) 2024 Mathematical Machines and Systems

This work is licensed under a Creative Commons Attribution 4.0 International License.
